West Seattle Corridor Bridge Rehabilitations and Strengthening

Project scope consist of removing conduit supports/conduits on interior of the high and low bridge sections to allow for carbon fiber panels to be installed to strengthen the bridges. Once strengthening was complete, Valley reattached conduits to the interior bridge walls. On the high bridge, conduits were added to feed new interior lighting, and we connected power to two temporary bridge cranes on the low bridge. On the bridge deck we repaired 25 conduit expansion/deflection fittings that have failed in the barrier. On the movable bridge section we maintained and repaired the bridge control wiring, as needed.

Project Info

Project Name

West Seattle Corridor Bridge Rehabilitations and Strengthening

Category

Completion

2022

City

Seattle, WA

Owner

City of Seattle

General Contractor

Kraemer North America, LLC

Delivery Method

Hard Bid

Sustainability

Awards

ENR Northwest - Best Bridge Project

Related Projects

SERVICE REQUEST

We provide 24 hours, 7 days a week service support and consultation when you need us the most. We are able to support you with any emergency, specialized project, from small work to the ongoing equipment maintenance and operation.

Valley Electric also offers clients proactive predictive maintenance, periodic maintenance programs that ultimately reduce cost and demands, while maintaining stringent quality measures.  We execute routine and emergency maintenance of electrical power systems and equipment.

You can contact our 24-hour electrical service and maintenance department at 1.888.424.7730 (Off hours). During the working hours, 7:00am to 3:30pm, please call 425.322.7403

This field is for validation purposes and should be left unchanged.
Name(Required)
Address

JOIN THE TEAM

This field is for validation purposes and should be left unchanged.
Name(Required)
Max. file size: 256 MB.
Skip to content