EN ES

Washington State Route 520 Eastside Transit & HOV

The SR520 project includes an improved six-lane corridor with two general-purpose lanes and one transit/HOV lane in each direction. Three highway lids provide local townships with urban parks and regional transit access, along with median transit stops at Evergreen Point Road and 92nd Avenue NE. In addition, the project includes a regional bicycle and pedestrian path, an Intelligent Transportation System (ITS), and Maintenance of Traffic (MOT). Valley designed and installed 6 City of Bellevue intersections as well as roadway illumination and Intelligent Transportation Systems (ITS) power.

Project Info

Project Name

Washington State Route 520 Eastside Transit & HOV

Category

Completion

2015

City

Bellevue

Owner

WSDOT

General Contractor

Granite Construction & PCL Construction

Delivery Method

Design-Build

Sustainability

Awards

2015 Alliant Build America Merit Award | Highway & Transportation Renovation

Related Projects

One of the TOP THREE LOWEST EMR of all Washington State in 2023!

CONTACT INFO

2200 6th Avenue, Suite 905
Seattle, WA 98121

1100 Merrill Creek Parkway
Everett, WA 98203

Estimating Inquiries
estimating@velectric.com

© 2023 – Valley Electric – All rights reserved. Online Presence by Digital Face Media

SERVICE REQUEST

We provide 24 hours, 7 days a week service support and consultation when you need us the most. We are able to support you with any emergency, specialized project, from small work to the ongoing equipment maintenance and operation.

Valley Electric also offers clients proactive predictive maintenance, periodic maintenance programs that ultimately reduce cost and demands, while maintaining stringent quality measures.  We execute routine and emergency maintenance of electrical power systems and equipment.

You can contact our 24-hour electrical service and maintenance department at 1.888.424.7730 (Off hours). During the working hours, 7:00am to 3:30pm, please call 425.322.7403

JOIN THE TEAM