Lynnwood High School

The new high school building Four wings radiate from a central commons: two are two-story classroom wings, the others are a performing arts wing and an athletics wing. The gymnasium and performing arts wings are designed to function separately from the rest of the building outside of normal school hours.

Project Info

Project Name

Lynnwood High School

Category

Completion

2013

City

Bothell, WA

Owner

Edmonds School District

General Contractor

ontrol Contractors, Inc.

Delivery Method

Fixed

Sustainability

LEED Silver

Awards

International Annual Design Award of the Council of Educational Facilities

Planners International James D. MacConnell Award for Outstanding New Educational Facilities

One of Ten “Schools of the 21st Century – The Latest Thinking and Best Ideas on the Planning and Design of K-12 School Buildings”, by Architectural Record magazine.

Related Projects

SERVICE REQUEST

We provide 24 hours, 7 days a week service support and consultation when you need us the most. We are able to support you with any emergency, specialized project, from small work to the ongoing equipment maintenance and operation.

Valley Electric also offers clients proactive predictive maintenance, periodic maintenance programs that ultimately reduce cost and demands, while maintaining stringent quality measures.  We execute routine and emergency maintenance of electrical power systems and equipment.

You can contact our 24-hour electrical service and maintenance department at 1.888.424.7730 (Off hours). During the working hours, 7:00am to 3:30pm, please call 425.322.7403

This field is for validation purposes and should be left unchanged.
Name(Required)
Address

JOIN THE TEAM

This field is for validation purposes and should be left unchanged.
Name(Required)
Max. file size: 256 MB.
Skip to content