Lakehaven Redondo Beach Wastewater Treatment Plant

This project consists of an electrical service upgrade, to a portion of the electrical systems and odor control facilities within the Redondo Wastewater Treatment Plant. The project will replace about half of the electrical and odor control components used in the wastewater treatment operations. Scope includes adding duct bank, new switchgear, generator, relocating MCC’s and control equipment in the existing facility. Expanding the capacity of the electrical system will also allow for planned future treatment process upgrades.

Project Info

Project Name

Lakehaven Redondo Beach Wastewater Treatment Plant

Category

Completion

2024

City

Des Moines, WA

Owner

Lakehaven Water & Sewer

General Contractor

Hoffman Construction

Delivery Method

ECCM

Sustainability

Awards

Related Projects

SERVICE REQUEST

We provide 24 hours, 7 days a week service support and consultation when you need us the most. We are able to support you with any emergency, specialized project, from small work to the ongoing equipment maintenance and operation.

Valley Electric also offers clients proactive predictive maintenance, periodic maintenance programs that ultimately reduce cost and demands, while maintaining stringent quality measures.  We execute routine and emergency maintenance of electrical power systems and equipment.

You can contact our 24-hour electrical service and maintenance department at 1.888.424.7730 (Off hours). During the working hours, 7:00am to 3:30pm, please call 425.322.7403

This field is for validation purposes and should be left unchanged.
Name(Required)
Address

JOIN THE TEAM

This field is for validation purposes and should be left unchanged.
Name(Required)
Max. file size: 256 MB.
Skip to content