Green River College Student Life Building

The 2-story, 71,400-sf center replaces the old Lindbloom Student Center, which was built in 1971. It houses a bookstore, food service, meeting rooms and staff spaces for student government, recreation, conference services and athletics. It also has the college’s first fitness center. LEED Silver. The Student Life Building replaces about half of the operations in the previous structure including :the bookstore, food service, meeting rooms and staff spaces for student government, recreation, conference services and athletics.

Project Info

Project Name

Green River College Student Life Building

Category

Completion

2015

City

Auburn, WA

Owner

Green River College

General Contractor

Walsh Group

Delivery Method

Sustainability

Awards

Related Projects

SERVICE REQUEST

We provide 24 hours, 7 days a week service support and consultation when you need us the most. We are able to support you with any emergency, specialized project, from small work to the ongoing equipment maintenance and operation.

Valley Electric also offers clients proactive predictive maintenance, periodic maintenance programs that ultimately reduce cost and demands, while maintaining stringent quality measures.  We execute routine and emergency maintenance of electrical power systems and equipment.

You can contact our 24-hour electrical service and maintenance department at 1.888.424.7730 (Off hours). During the working hours, 7:00am to 3:30pm, please call 425.322.7403

This field is for validation purposes and should be left unchanged.
Name(Required)
Address

JOIN THE TEAM

This field is for validation purposes and should be left unchanged.
Name(Required)
Max. file size: 256 MB.
Skip to content