Valley Electric Logo

Valley Electric
This text is replaced by the Flash movie.
Seattle-Tacoma International Airport South Terminal Expansion Project -
Concourse A

SeaTac, WA
Valley Electric was the prime electrical sub-contractor for the $375 million South Terminal Expansion Project (STEP). The project included the addition of seven new aircraft gates, providing 14 gates on Concourse A. The Terminal also features moving walkways, four retail stores, nine food concessions, a new baggage system, loading dock, an auditorium and airline offices.

The project doubles the length and width of the existing Concourse. Highlighting a spectacular view of Mount Rainier, the International Arrivals Hall with a 70-foot ceiling and large windows is the focal point of the structure.

Home
Profile
Services
Projects
Safety
Contacts
SITE MAP   |   DISCLAIMER
1100 Merrill Creek Parkway Everett, WA 98203   Office: (425) 407-0832   Fax: (425) 407-0578